EuroSibEnergo

EuroSibEnergo is Russia’s largest independent power company (in terms of installed electricity capacity of power generation plants) and ranks as one of the largest hydropower generation companies in the world. The company controls 18 power generation plants with a combined installed electricity capacity of 19.5 GW and heat power generating assets with 17485 Gcal/h of total installed heat capacity. Over 15 GW capacity is provided by major Russian hydro power plants located on the Siberian rivers the Angara and the Yenisei, namely the Krasnoyarskaya HPP, Bratskaya HPP, Ust-IlimskayaHPP and Irkutskaya HPP. One of the key advantages of the company is its vertical integration, from coal production for our CHPs and generation of electric and heat power, to sales to end consumers.

In 2010, EuroSibEnergo produced 87.1 TWh of electricity (more than 72 TWh of which were generated by HPPs), which represented approximately 9% of Russia’s total electricity production. Consolidated revenue in 2010 exceed 87 billion roubles, EBITDA was 27.4 billion roubles.

 
 
Журнал «Три дня»

Three Days magazine 2011 Three Days magazine 2010 Three Days magazine 2009 Three Days magazine 2008
YouTube Preview Image